日前,我司完成京能电力后勤服务有限公司察右中旗石灰石矿接地设计方案。该项目位于察右中旗,地区石灰石山顶,土壤结构环境恶劣。该项目是我司利用加拿大SES公司开发的CDEGS软件完成的第一个接地设计。
===============================
Original Electrical Current Flowing InElectrode..: 1000.0 amperes
Current Scaling Factor(SPLITS/FCDIST/specified)..: 1.0000
Adjusted Electrical Current Flowing In Electrode..: 1000.0 amperes
Number of Conductors inElectrode.................: 7
Resistance of ElectrodeSystem....................: 7.0672 ohms
SUBDIVISION
===========
Grand Total of Conductors AfterSubdivision.: 16
Total Current Flowing In MainElectrode......: 1000.0 amperes
Total Buried Length of MainElectrode........: 40.000 meters
EARTH POTENTIAL COMPUTATIONS
============================